Installation of rack and cradle pg 4-5, Installation of flaming river column, Flaming river tilt column pg 6 – Flaming River Thunderbird Rack & Pinion Cradle Kits 1955-57 User Manual
Page 2: Thunderbird rack & pinion system

Thunderbird Rack & Pinion System
Page 1 of 13
Flaming River Ind. 800-648-8022
Modified on 02/06/08
JJ/RD/BC
Index
For safety disconnect battery cables and ensure that vehicle is properly supported by jack
stands.
Before paint or powder coating of the rack and pinion cradle system we recommend that you pre-fit
the system to ensure proper fit.
Inventory
PG 2
Electrical
System
Verification
PG
3
Removal of Factory Steering
PG 3
Installation
of
Rack
and
Cradle
PG
4-5
Installation of Flaming River Column
Flaming River Tilt Column
PG 6
Original Steering Wheel Installation
PG 7
Aftermarket Steering Wheel Installation
PG 8
Electrical System Notes
PG 9
Note: Floor Mount is not included in this kit. Existing floor will need to be modified or a new floor mount
will need to be fabricated.
Universal Joint and Steering Shaft Installation
PG 10
Power
Steering
Pump
Installation
PG
11
Power Steering Bleeding Procedure
PG 12
Warranty Disclaimer
Because of their intended usage, the manufacturer makes no warranties whatsoever express or
implied, oral or written, to purchasers of their products regarding performance, safety, fit
merchantability, or length of service. Purchasers are responsible for selection of proper goods and
must rely on there own skill or judgment that such goods are suitable for purchasers application.