Ridetech 41240000 User Manual
Page 2

TGR14000 Installation Instructions
• Initial fitment of the floor mount brackets must be done under the carpet. Final installation can
be done under or over the carpet.
• Use Anti-Seize on all fasteners that are threaded into stainless clamps or brackets. 
• Install all bars before final tightening. 
• Always tighten the tab side of the clamp first. 
• Torque all 3/8” fasteners to 45 ft-lbs and all 1/2” fasteners to 75 ft-lbs. 
• Make sure the clamp is exactly where you want it before tightening as the clamp may scratch 
the tubing.
• Watch for fuel and brake lines when drilling holes through the floor pan.
 
 
 
 
 
 
 
 
1. Start by replacing all of the body 
mounts with the new polyurethane 
mounts included. Using the old 
rubber mounts can cause clearance 
and fitment issues. 
2. Position the main hoop floor 
mount so that the front of it is 38 5/8” 
behind the pinch weld at the front of 
the door opening. 
3. Using the bracket as a template; 
drill six 3/8” holes through the floor 
pan. Drop 3/8” x 1 ¼” bolt w/ flat 
washers down through floor pan. 
4. Bolt the frame brackets to the 
bottom of the floor pan using 3/8” 
Nylok nuts and flat washers. These 
two brackets attach to the inside of 
the frame rail. 
5. The frame should be drilled with a 
3/8” bit for the rear bracket. Use 
3/8” x 1 ¼” Nylok nut and flat 
washers to secure the bracket to the 
frame. 
6. The holes for the front bracket 
need to be drilled with a 5/16”. A 
3/8” x 1” self-tapping screw is used 
on this bracket since the frame is 
boxed in this section. 
