In addition to the supplied items, you may need:

Operating system or application software

Hardware options

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the

option documentation. For server-specific information, refer to "Hardware options installation (on page

39

)."

Installing the server into the rack

CAUTION:

Always plan the rack installation so that the heaviest item is on the bottom of the

rack. Install the heaviest item first, and continue to populate the rack from the bottom to the top.

1.

Install the server and cable management arm into the rack. For more information, refer to the
installation instructions that ship with the 2U Quick Deploy Rail System.

2.

Connect peripheral devices to the server.

Item Description

Color

1

Expansion slot 1

2

Expansion slot 2

3

Expansion slot 3

4

Expansion slot 4

5

Expansion slot 5

6

T-10/T-15 Torx screwdriver

7 External

option

blank

8

NIC 2 connector

9

NIC 1 connector