beautypg.com

Installing the bbwc battery pack – HP ProLiant DL360 G6 Server User Manual

Page 57

background image

Hardware options installation 57

5.

Install the cache module in the SAS cache module connector on the system board. For connector
locations, see "System board components (on page

11

)."

6.

Install the PCI riser board assembly (on page

24

).

7.

Install the access panel (on page

21

).

8.

Slide the server into the rack.

9.

Power up the server (on page

19

).

Installing the BBWC battery pack

1.

Power down the server (on page

19

).

2.

Extend the server from the rack (on page

19

).

3.

Remove the access panel (on page

21

).

4.

Remove the PCI riser board assembly (on page

23

).

5.

Install the cache module ("

Installing the cache module

" on page

56

).

6.

Install the BBWC battery pack.