Install server b assembly – HP ProLiant BL2x220c G5 Server-Blade User Manual
Page 15
![background image](/manuals/397989/15/background.png)
Operations 15
To remove the component:
1.
Power down the server blade (on page
2.
Remove the server blade (on page
3.
Place the server blade on a flat, level work surface with the bezel facing away from you.
4.
Extend the server B serial label pull tab.
CAUTION:
The jackscrews control the unseating and seating of critical system connectors.
Failure to use the jackscrews to remove and install the server B assembly can cause the system
boards to fail.
5.
Turn jackscrew 1 approximately six turns counterclockwise.
6.
Turn jackscrew 2 counterclockwise until the threads are fully disengaged.
7.
Turn jackscrew 1 counterclockwise until the threads are fully disengaged.
CAUTION:
To prevent damage to the server blade, do not apply pressure to the enclosure
connector.
8.
Lift server B assembly from server A assembly, and then place it on the work surface with the system
board facing up.
Install server B assembly
For access component identification, see "Access components (on page
1.
Extend the server B serial label pull tab.
2.
Engage the front edge of server B assembly with the front edge of server A assembly.
CAUTION:
Route the cache module battery cables so that they do not become pinched when
the server B assembly is installed.
3.
Lower server B assembly onto server A assembly.
4.
Align the signal and power connectors on server B assembly with the corresponding connectors on
server A assembly.