Installing the enclosures, Installation checklist, 3 installing the enclosures – HP 2000I G2-Modular-Smart-Array User Manual
Page 21: 2 installation checklist, 3installing the enclosures
HP 2000i G2 Modular Smart Array User Guide
21
3
Installing the enclosures
Installation checklist
The following table outlines the steps required to install the enclosures and initially configure the system. To
ensure a successful installation, perform the tasks in the order they are presented.
NOTE:
For help with installing your MSA2000 G2 product, see the HP StorageWorks 2000 Modular
Smart Array Software Support/Documentation CD shipped with your product.
NOTE:
For information on NEBS Level-3 compliant carrier-grade enclosures, see
Table 2
Installation checklist
Step
Task
Where to find procedure
1.
Install the controller enclosure and optional
drive enclosures in the rack, and attach ear
caps.
See the racking instructions
poster.
2.
Connect controller enclosure and LFF/SFF
drive enclosures.
3.
Connect power cords.
See the installation poster.
4.
Test enclosure connections.
5.
Obtain IP values and set management
port IP properties on the controller
enclosure.
6.
Install required host software.
7.
Connect data hosts.
See
8.
Connect remote management hosts.
See
9.
Perform initial configuration tasks:
•
Verify that controllers and enclosures
have the latest firmware.
•
Set the date and time on the controller
enclosure.
•
Initially configure and provision the
system.
•
Test the configuration.
See