Complete installation – Badger Meter ORION AMR/AMI Hardware Solutions for Gas Utilities User Manual
Page 19
Installation Manual
Programming Procedure
To program the endpoint, align the IR port of the handheld optic read head with the endpoint IR port
Figure 34: Line up the handheld IR port with the endpoint IR port
COMPLETE INSTALLATION
After programming, add seal caps to the front and rear index cover screws Only the front screws are shown below
Figure 35: Add seal caps
If the index mounting screw seal caps were removed, replace them with the extra caps provided in the installation kit
Figure 36: Replace index mounting screw seal cap
This completes the installation of an ORION integral endpoint on an American Commercial Diaphragm and Turbine Meter
with Plastic Security Seals
Page 19
July 2014
This manual is related to the following products: