beautypg.com

Neocor install instructions 2, Step, Door installation – Aleco NeoCor User Manual

Page 3

background image

Jamb Guard

3/8” x 2”
Masonry Anchors

Pivot Door Into Place
over Mounting Holes

Insert
Pivot Pin

Step

2

Door Installation

2.2

Make sure the top V cam is placed on the top
shaft and the cam roller is attached to the top
shaft (Fig. 2). The cam roller should be securely
attached to the shaft with the allen head set
screw that is already installed in the cam roller.

2.3

Rotate the bottom bearing slightly around the
bolt installed in Step 2.1. Remove tape and place
the bottom shaft of the door into the bottom
bearing (Fig. 4). Raise the door in the opening
and insert the other bolt into the bottom bearing
and hand tighten.

2.4

Attach the top cam bearing to the jamb with
four 3/8” 16 x 7/8” bolts and lock washers,
hand tighten.

2.5

Allow the full weight of the door to hang on
the hinge and then tighten the mounting bolts
on both the top V cam and the bottom bearing
with a wrench or socket.

Bottom Bearing

V Cam Bearing

Set Screw

Cam Roller

Fig. 2

Fig. 3

Fig. 4

2.1

Attach the bottom bearing to the jamb with
one 3/8” 16 x 7/8” bolt and lock washer, hand
tighten (Fig. 3).