beautypg.com

Step, Doorway preparation – Aleco RD-175 User Manual

Page 2

background image

Header is Level

Attach Top
Mounting Angle

Center Plumb
Line on Jamb

Attach Jamb
Guard

Jamb is
Plumb

Center Punch
Drill (1/4” or 3/8” electric)
Drill bit: #7 (for steel channel)
Extension Cord
Hammer
Level (3’ minimum)
Need Nose Pliers
Pen or Pencil
Plumb Bob
Screwdriver, Slotted
Tape Measure
Tap 1/4“ 20 NC
(for steel channel)

Step

1

Doorway Preparation

1.1

Inspect. If carton or doors are damaged from

shipping (bent shaft, etc.), contact factory.

1.2

Check jamb and header for plumb, level and

square (measure diagonals).

1.3

Match size of door opening to size on packing slip.

1.4

Mark center plumb line on jamb.

1.5

Remove the top mounting angle from the door by

removing the hardware housing screws from the

top corner of each side.

1.6

Line up the centerline on the bottom of the

mounting angle with jamb centerline. Use the

angle as a template to mark the hole locations

on the jamb and header and center punch the

holes.

1.7

Use the jamb guard as a template for the bottom

mounting holes, lining up the centerline of the jamb

guard with the centerline of the jamb. Mark the hole

locations on jamb and floor and center punch the holes.

1.8

Drill centers with #7 bit (for steel channel), tap 1/4  20

and fasten to jamb with 1/4  20 bolts.

1.9

If jambs are wood or hollow metal over wood, fasten using

1 1/2” wood lags. Hollow metal frames without wood rough

blocks should have 1/4” steel reinforcements (b/o) at jamb and

header mounting locations.

Required Tools

This manual is related to the following products: