beautypg.com

Electrical installation – KROHNE ALTOSONIC V Installation EN User Manual

Page 18

background image


18 www.krohne.com

04/2012

ALTOSONIC V

ELECTRICAL INSTALLATION

3

3.5 Connecting Flow Sensor to the Flow Computer

The Flow Sensor UFS-V also has to be connected to the I/O-rack of the Flow Computer UFP-V.
This is the PT100 connection which is connected in the Flow Sensor UFS-V to the PT100 (body
temperature) and in the I/O-rack to the MTL5073 module (A1) as shown below. This connection
has to be made with a shielded 4-wire cable (not supplied). In the Flow Sensor UFS-V and the
I/O-rack (Flow Computer UFP-V) this cable has to be connected in such way that the shield is
connected to the shield connectors. The cable has to be connected according to the table below.

Connector X2 UFS-
V

Wire

Connector MTL5073 module

5 1

1

7 3

3

6 2

4

8 4

5



Overview I/O-rack (Flow Computer UFP-V) front side

Module A1 ( I/O-rack Flow Computer UFP-V )