SITE PREPARATION CHECKLIST
1. Select site and design fl oor plan accordingly.
2. Ensure all environmental conditions are met.
3. Establish contractor and vendor schedules.
4. Check communication line requirements.
5. Plan installation and accessory needs before starting.
6. Check fl oor plan and make necessary alterations.
7. Install all required electrical fi xtures.
8. Prepare site for communications needs.
9. Plan operator/training exercises (optional).
10. Install communication lines and test.
11. Ensure installation accessories are available.
T
EMPERATURE
/ H
UMIDITY
1. The ATM will operate over a range of
temperatures and humidity. Generally, these
parameters must fall within the following
ranges:
Temperature
•
10°C to 40°C
•
50°F to 104°F
Relative Humidity
•
20% to 80%
• (Non-Condensing)
AC P
OWER
R
EQUIREMENTS
2. Ensure the following AC power requirements are met:
Power Consumption (Idle)
•
0.6A @ 115 VAC at 60 Hz
Power Consumption (Max Load)
•
250 Watts @ 120VAC
Current (Max)
•
2.2A @ 115 VRMS at 60 Hz
Voltage
•
90 - 136 VRMS @ 50/60 Hz
E
NVIRONMENTAL
P
RECAUTION
C
HECKLIST