Assembling the display housing, Final steps – Seca 677 User Manual
Page 67

Before you really get started ... • 67
English
Assembling the display
housing
1. Take the display cable out of the fixing in the railing.
2. Connect the display cable in the railing to the cable
of the display housing.
3. Push the cable carefully into the railing.
4. Place the display housing on the railing.
5. Ensure that the bores on the display housing and
the bores in the railing are in line over one another.
6. Screw the display housing firmly to the railing.
Final steps
1. Ensure that all parts are correctly located.
2. Ensure that all screws are fully tightened.
Display cable
3 x B 3.5 x 9.5
This manual is related to the following products: