beautypg.com

Roll up door kit, Assembly instructions – Rhino Shelter BARN-12W X 28L X 12H User Manual

Page 11

background image

Assembly Instructions

Barn Style 12 x 28 x 12

Pay close attention to how tight the cover is put onto the
frame. It should be tight enough so it does not flap
around in the wind, but not so tight that it tears the
material cover. The fabric backed PE fabric of Rhino
Shelter units does not stretch. If you pull it so tight that
the fabric is stretched, a small amount of additional
stress from wind or contact will cause premature tears
and failure. Only tighten cover enough to remove
valleys between arch assemblies. Do Not over tighten.

Step 4. Retighten the turnbuckles on both the cover and
end panels. Retighten the rope holding the main cover
to the bottom cross rail. Both the cover and the end
panels should be checked and tightened on a
monthly basis.

V1.2

Do NOT Return Assembly To Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products Directly

Customer Service 800-447-7079 or 203-877-7070

11

Lace rope through grommets and around Base Cross

Rails

ROLL UP DOOR KIT

A #23 Roll Up Door Kit is included with Barn style
buildings.
Rhino Shelter doors are manufactured with a pocket on
the bottom edge along the width axis. Combine the two
pieces of 1 1/8” diameter tubing provided with the
machine thread screw. Place one 1 1/8” plastic end plug
into one end of the tube assembly. Fill the tube with
sand or comparable weight material, and place the other
plastic plug into the end of the tube. The additional
weight will reduce door movement in wind, and assist it
in rolling up. Place the weight tube into the bottom edge
pocket in the door. Center the weighted tube between
the edges of the door.

Tie the rope provided onto the end arch under the roll up
door material over the end arch. Thread the rope under
the door edge to the outside of the unit

Two rollers are provided, which must be mounted onto
the door at the top outside edge. Cut a small ½” slit in
the material so the rollers can be mounted over the rope
in the door as shown in the illustration.

Cut the rope to the lengths needed. They will NOT be
the same length; so do not cut the rope before putting
through the rollers on top and pulling both to one side.

Roller installs on outside rope channel of door


Thread the rope through the rollers as shown in the
picture below. The door can now be rolled up by pulling
on both ropes to one side. A cleat tie off is provided as
well. This can be mounted to the end arch frame
between the door flaps, or through the cover on the
outside of the unit to the end arch member.

Roll Up Door Kit with Door partially opened


Three (3) straps are provided on each door side zipper
to reduce the strain on the zipper when the wind blows.