Rhino Shelter SHED-8W X 8L X 8H User Manual
Assembly instructions shed style 8wx8lx8h, Assembly instructions, Shed house style 8 x 8 x 8
Assembly Instructions
Shed House Style 8 x 8 x 8
V1.0
Do NOT Return Assembly To Dealer or Store. For All Questions or Shortages Please Call MDM Products Directly
Customer Service 800-447-7079 or 203-877-7070
Assembly Instructions
Shed Style 8Wx8Lx8H
Congratulations!
Congratulations on your purchase of a Shed Style
Instant Shelter by MDM Products LLC. With proper
installation, use, and maintenance, your new unit will
provide many years of good and suitable service. Your
new MDM Products portable enclosure is a combination
of excellent engineering and well thought out design.
The unit is comprised of a rigid tubular frame, covered
with a long life polyethylene cover and double access
ends.
The multiple part tubular frame assembly is pre-drilled
for easy insertion of hardware to assemble. The tubing
is made from high-grade galvanized steel tubing, to
resist moisture and oxidation over the life of the shelter.
The fabric components are made from ASTM-5
approved polyethylene materials. The cover is also UV
protected for continual exposure to the sunlight.
It is suggested that you read the assembly instructions
completely before you begin. This will help attain the
best results for your installation the first time.
SAFETY WARNING
The installation of this unit must conform to the
requirements of all authorities having jurisdiction in your
specific local area. In the absence of such
requirements, the installation must conform to the
provided assembly and installation instructions. MDM
Products LLC will not be responsible for failure to comply
with any requirements in a given local area.
Consequential damages or injuries caused by improper
installation, alteration, or improper use are strictly that of
the user. Unit MUST be cleared of All Snow
Accumulation immediately to avoid overload. Unit is not
to be used for occupancy for any length of time. No
running internal combustion engines, open flames, or
contact with heated surfaces are allowed.
For installation assistance or Customer Service, please
call 800-447-7079 or 203-877-7070, 8AM-5PM EST.
Cartons should be inspected upon delivery from carrier,
and any evident damages should be noted on the bill of
lading before signing. If upon opening the cartons
hidden damage is noted, contact carrier or its agent
immediately. Claims for shipping damage MUST be
made with the shipping company. An inspection of the
goods will most likely be required. Do not discard
packing or any components before the freight company’s
inspection. All claims for freight damage must be made
with 15 days of receipt of the goods in accordance with
ICC regulations.
Assembly Procedure
The proper sequence and steps to install this unit will
produce a proper and good installation. Failure to read
and follow these guidelines may result in an improper
installation and will void all warranty and protection the
owner is entitled to with the product. The steps to be
undertaken are:
1. Perform an inventory check before beginning to be certain
all components are available for installation.
2. Prepare location and place both unit boxes near location
sight.
3. Assemble three (3) arches of unit
4. Assemble unit end arch, interior arch, and wind braces
with first top ridge, base cross rail, and side cross rail
sections.
5. Add end arch assembly with sections of top ridge rail,
base cross rails and side cross rails.
6. Place frame into desired position and level frame both
end-to-end and side-to-side. Measure interior of frame
feet across opposite corners and square as needed.
7. Anchor frame assembly to ground with provided anchors,
u-bolts and drive rod provided.
8. Install two(2) doors on both ends of frame assembly.
9. Install main cover over frame assembly.
Tools Required
The following hand tools are suggested for proper
installation of your new MDM Products unit:
9/16” Open End Wrench
9/16” Socket or Box Wrench
Large Flat Tip Screwdriver
Maul or Sledgehammer
2-foot
Level
6-Foot Step Ladder
Inventory Check
Start installation procedure by removing all components
from packaging and ensure all components are present
Number
Qty
Description
1
6
Bent Side Tube Crest
2
3
Top Crest Support
3
4
End Upright w/Foot
4
2
Center Straight Upright
5
5
Cross Rail A – Top, Side, Base
6
5
Cross Rail B – Top, Side, Base
7
2
Corner Wind Brace
8
15
3/8” x 3.25” Carriage Bolt
9
8
3/8” x 2.125” Carriage Bolt