e
panel to the inside of the frame arch. End Door Panels
have pre-cut slits that allow frame members to pass
through so rope pocket is inside unit. Place the top ridge
pole and the side cross rails through the material slits
and replace the carriage bolts and tighten. The door end
will also require removal of the wind brace bolts and
placement of the wind braces through slits in the ends
panel. Reconnect wind braces with carriage bolts onc
end panel is put into place.
The rope channels should be located inside the unit, with
ckle Attached to Base Foot
Door Turnbu
the frame members passing through the pre-cut slots in
ain cover are tightened over
the end panel/door. Replace and tighten the carriage
bolts after putting the end panel into position.
Door assembly is drawn taut over end frame by
tightening rope and securing to turnbuckles at the arch
foot. Frame must be secured in position so it does not
ove as end doors and m
m
frame. This step is key to good fit and to prevent door
movement in wind.
Door Panel
positioned over end
arch with cross
rails through fabric
When putting on the doors, adjust the length to make
certain the doors do not drape onto the ground. Adjust
door length by pulling more or less fabric over end arch.
If pulling them up puts too much stress on the slit where
it goes over the wind brace, use a sharp knife to cut slit
another inch or two to relieve it. The PE fabric is rip-stop
weave, and can easily be cut to relieve stress at the
ame members.
s
Rail
fr
Side Cros
Wind Brace