beautypg.com

Anchor step 2, End panel installation, Assembly instructions – Rhino Shelter BARN-12W X 20L X 12H User Manual

Page 7

background image

Assembly Instructions

Barn Style 12 x 20 x 12

Pre-Drill Holes if there is Any Rock In Ground


ANCHOR STEP 3

Slip one side of the U-bolt through the eyelet at the en
of the anchor cable. Attach the cable to the Arch leg

pright with the U-bolt and tighten. Do not attach

d

to base

u
cross rails. Ensure there is no slack in the cable. Slack
can be removed by wrapping the cable around the tie-
down rail.

Pull U-Bolt &

Anchor Loop up on

Arch Base and

Tighten

Drive Rod inserts into Anchor Head


ANCHOR STEP 1

Step 1. Place the drive rod provided into the cup of the
anchor. Using a heavy hammer drive the anchor into the
soil until 6-8 inches of cable remains above the earth.
Remove drive rod.

ANCHOR STEP 2

Place the Drive Rod through the loop in the anchor
lanyard. Pull upward to set anchor head into the ground.


END PANEL INSTALLATION

Note: Both End Panels MUST be installed before

installing Main Cover onto frame.


Step1. Remove Carriage bolts from the Top Crest Rail
and the two Upper Cross Rails. Install one #14 End
Panel Door w/Zippers at a time to the Frame assembly.

Step 2. Place the end panel over the first arch and wrap
the material around the arch bringing the slits in the en

d

V1.2

Do NOT Return Assembly To Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products Directly

Customer Service 800-447-7079 or 203-877-7070

7