Anchor step 2, End panel installation, Assembly instructions – Rhino Shelter BARN-12W X 20L X 12H User Manual
Page 7
Assembly Instructions
Barn Style 12 x 20 x 12
Pre-Drill Holes if there is Any Rock In Ground
ANCHOR STEP 3
Slip one side of the U-bolt through the eyelet at the en
of the anchor cable. Attach the cable to the Arch leg
pright with the U-bolt and tighten. Do not attach
d
to base
u
cross rails. Ensure there is no slack in the cable. Slack
can be removed by wrapping the cable around the tie-
down rail.
Pull U-Bolt &
Anchor Loop up on
Arch Base and
Tighten
Drive Rod inserts into Anchor Head
ANCHOR STEP 1
Step 1. Place the drive rod provided into the cup of the
anchor. Using a heavy hammer drive the anchor into the
soil until 6-8 inches of cable remains above the earth.
Remove drive rod.
ANCHOR STEP 2
Place the Drive Rod through the loop in the anchor
lanyard. Pull upward to set anchor head into the ground.
END PANEL INSTALLATION
Note: Both End Panels MUST be installed before
installing Main Cover onto frame.
Step1. Remove Carriage bolts from the Top Crest Rail
and the two Upper Cross Rails. Install one #14 End
Panel Door w/Zippers at a time to the Frame assembly.
Step 2. Place the end panel over the first arch and wrap
the material around the arch bringing the slits in the en
d
V1.2
Do NOT Return Assembly To Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products Directly
Customer Service 800-447-7079 or 203-877-7070
7