beautypg.com

Operation – Lincoln Electric IM991 LN-25 PRO DUAL POWER User Manual

Page 28

background image

B-10

OPERATION

B-10

REAR CONTROLS:

LN-25™ PRO DUAL POWER

1

Gas Purge Pushbutton

2 Flow

Meter

Ball

4

Shielding Gas Inlet

3

Flow Meter Valve

6

Optional Water cooled gun

connections

7

Control Cable input

5 Electrode

Lead

ITEM

DESCRIPTION

1

2

3

4

5

6

7

FIGURE B.4