Davey CLEVALINK SYSTEM CONTROLS User Manual
Page 14
14
Installing an LCU:
1. When installing your LCU it is easier to program the network prior to mounting.
Simply plug in to any power outlet to activate the unit and begin programming.
Refer to the section titled “Operating the LCU”.
2. Mount the LCU in a location that is greater than 3.5 meters from the pool zone
and less than 1.5 meters from a power supply socket.
3. Plug the appliances to be controlled, into the outlets in the base of the LCU.
WARNING: The total current of the LCU must not exceed 10 Amp
4. Plugs the mains input lead into the power outlet 240V supply.
5. Switch on the power outlet and the 2 override switches on the LCU unit
(mechanical rocker switch above the outlets).
Operating the LCU:
Press
Selected
Display
Press and Hold outlet power
button, Red LED Will start to
flash, keep holding and go to
next step
.
Press and hold selected
remote button,
Signal LED will flash Green
when I.D. has been sent,
Function LED will flash when
I.D. has been received.
Release buttons.
Record the function of the
remote button on the label
supplied