Installing the switch, In this chapter, Selecting a site – Brocade 6910 Ethernet Access Switch Hardware Installation Guide User Manual
Page 25: Chapter 2
Brocade 6910 Ethernet Access Switch Hardware Installation Guide
9
53-1002650-02
Chapter
2
Installing the Switch
CAUTION
Procedures are for qualified service personnel only.
In this chapter
•
•
•
•
•
Installing an Optional SFP Transceiver. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
•
•
•
•
Selecting a Site
Switch units can be mounted in a standard 19-inch equipment rack or on a flat surface. Be sure to
follow the guidelines below when choosing a location.
•
The site should:
•
be at the center of all the devices you want to link and near a power outlet.
•
be able to maintain its temperature within -40 to 65 °C (-40 to 149°F) and its humidity
within 10% to 90%, non-condensing
•
provide adequate space (approximately two inches) on all sides for proper air flow
•
be accessible for installing, cabling and maintaining the devices
•
allow the status LEDs to be clearly visible
•
Make sure twisted-pair cable is always routed away from power lines, fluorescent lighting
fixtures and other sources of electrical interference, such as radios and transmitters.
•
Make sure that the unit is connected to a separate grounded power outlet that provides 100 to
240 VAC, 50 to 60 Hz, is within 2 m (6.6 feet) of each device and is powered from an
independent circuit breaker. As with any equipment, using a filter or surge suppressor is
recommended.