STI SUB-6297B20 User Manual
Ab a, Installation instructions - refer to exploded view
INSTALLATION OF SUB-6297B20 CONDUIT HUB ASSEMBLY
All specifications and information shown were current as of publication, and are subject to change without notice.
SUB6297 APRIL2006
D
C
L
C
BACKBOX
GASKET
INTERSECTION LINE
HUB
A
C
L
B
A
CENTER LINE
OF HOLES A & B
623002 GASKET
19074 KEPS NUT
1/4 - 20 (2) PROVIDED
A
B
A
06297B20 CONDUIT HUB
ACCEPTS 3/4 in. RIGID CONDUIT FITTINGS
19073 HEX HEAD CAP SCREW
1/4-20 x 3/4 in. STAINLESS
(2) PROVIDED
VIEW IN DIRECTIONS OF ARROW
D
BACKBOX
A
Safety Technology International, Inc.
2306 Airport Road • Waterford, Michigan 48327-1209
Phone: 248-673-9898 • Fax: 248-673-1246
Toll Free: 800-888-4784 • E-mail: [email protected]
Web: www.sti-usa.com
Safety Technology International (Europe) Ltd.
Unit 49G Pipers Road • Park Farm Industrial Estate • Redditch
Worcestershire • B98 0HU • England • Tel: 44 (0) 1527 520 999
Fax: 44 (0) 1527 501 999 • Freephone: 0800 085 1678 (UK only)
E-mail: [email protected] • Web: www.sti-europe.com
1. Remove the backing paper from the gasket and attach it to the back of
the hub.
2. Select the location on the back box where conduit hub is to be
mounted.
3. Align the center of holes A & B directly on intersection line C.
4. Using a pointed tool, mark a center point in the center of holes A & B
on the intersection line C.
5. Drill three (3) holes: Hole A 7/32 in. diameter, Hole B 1/2 in. diameter.
6. Complete installation as shown.
INSTALLATION INSTRUCTIONS - REFER TO EXPLODED VIEW
Electronic warranty form at www.sti-usa.com/wc14