beautypg.com

Stuart Turner Jet Pump 45 B User Manual

Page 5

background image

- 5 -

Cont ...

1 READ BEFORE COMMENCING PUMP INSTALLATION

A.

Water storage capacity.
1.11 The cold water storage capacity must be sufficient to meet the flow rates

required by the pumped equipment and any other water using fittings and

appliances, which may be operated simultaneously.

1.12

Ensure the pump is primed as described in the priming section before starting,

damage to the shaft seal will result otherwise. See Section 4 - Commissioning.

B.

Water temperature
The water entering the pump must be controlled as follows:
1.13 The maximum allowable water temperature is 35

o

C.

1.14 The minimum allowable water temperature is 4

o

C.

C.

Pipework - General
1.15

Secure pipework: Ensure pipework to and from pump is independently

supported & clipped to prevent forces being transferred to inlet and outlet

branches of pump.

1.16

Flux: Solder joints must be completed and flux residues removed prior to pump

installation

(flux damage will void any warranty).

1.17

Pipework design: Care should be taken in the design of pipework runs to

minimize the risk of air locks e.g. use drawn bends rather than 90

o

bends.

1.18

DO

NOT introduce solder flux to pumps or pump parts manufactured from

plastic.

1.19

DO

NOT allow contact with oil or cellulose based paints, paint thinners or

strippers, acid based descalents or aggressive cleaning agents.

1.20

DO

NOT install a non-return valve, or devices which contain non-return

valves, in the suction (inlet) pipework to the pump. The pump must be free

to vent to the supply tank at all times unless pump in suction lift

application.

1.21

DO NOT connect this pump to the mains water supply.

D.

Plumbing & Electrical Installation Regulations
1.22 The plumbing installation must comply with “The Water Supply (Water Fittings)

Regulations 1999” and “BS 6700” building regulations.

1.23 The plumbing installation must be installed by a qualified person.
1.24 The electrical installation must be carried out in accordance with the current

national electrical regulations.

1.25 The electrical installation must be installed by a qualified person.

E.

Pressure vessel
1.26 Pressure vessel is charged at the factory see Section 5 - Maintenance for

details.