beautypg.com

Stuart Turner Jet Pump 45 B User Manual

Page 13

background image

- 13 -

Cont ...

5 MAINTENANCE

5.11

Pressure vessel: The pressure vessel should be checked once every 6 months

to have its air charge checked or replenished, this should be carried out

as

follows:-

a) Isolate pump electrically.

b) Isolate the water supply by closing the appropriate isolating valves.

c) Release system water pressure by opening a system outlet on the system.

d) Remove pressure vessel from the pump taking care to collect or absorb any

residual water using towels.

e) Check air charge at Schrader valve (Fig. 9) using a tyre pressure gauge.

f) Replenish air charge if required by injecting air into the vessel via the

Schrader valve using a car or bicycle pump, see Pre-installation assembly.

g) Reassemble pressure vessel to pump hand tight to achieve a water tight

connection. Ensure sealing ‘O’-ring is in place.

h) Close all system outlets, open inlet and outlet isolating valves.

i) After maintenance is completed refer to Section 4 - Commissioning for

instructions on re-starting pump.

5.12

Cleaners, Disinfectants and Descalents:

Acid based descalents and aggressive cleaning agents must not
come into contact with the pump. The pump must be removed from
the system prior to the use of these products. The system should be
flushed to remove all chemicals before the pump is re-connected.
If in any doubt as to the suitability of the chemical solutions, please
contact our Pump Assist helpline.

Fig. 9

Detail view of
‘O’-Ring groove
in fitting point

‘O’-Ring

Schrader valve
(under cap)

Pressure vessel

‘O’-Ring

Fitting point

Model

Air Precharge

bar (psi)

All other
models

2.0 (29)

NOTE: Do not over tighten pressure vessel.