beautypg.com

Stuart Turner Monsoon Extra U1.4 bar Single User Manual

Page 4

background image

- 4 -

Fig. 2

Grub Screws
(3 off)

Outlet Tower can be swivelled at
this joint line after loosening the
3 equi-spaced grub screws

PRE-INSTALLATION ASSEMBLY

Re-positioning of Pressure Vessel

The pressure vessel can be rotated to alternative positions (Figs. 3 & 4) in the event of

the factory fitted position being unsuitable for a specific installation.

a) Remove pressure vessel by unscrewing anti-clockwise.
b) Using a 2 mm allen key (not supplied), carefully loosen all three retaining grub

screws by two turns (Fig. 2).

c)

Warning - Care must be taken when re-positioning the pressure vessel to

ensure no strain is placed upon the pressure

switch or reed switch cables.

The flow switch assembly can now be carefully

rotated to an alternative position

(Figs. 3 & 4).

d) Ensure all three grub screws are

re-tightened securely to a torque

of 2.2 Nm (1.62 ft lbf).

e) Re-fit the pressure vessel

ensuring the ‘O’-ring seal

is in place.

Motor

Motor

Factory fitted position
U1.4 bar

Area for alternative fitting
positions

Area for alternative fitting positions

Factory fitted position U2.6 bar,
U3.6 bar, U5.0 bar

Fig. 3

Fig. 4