Set up – MAHLE RTI MCX-2F (Rev C) User Manual
Page 5

Page 4
New Coolant Tank
Coupler
Quick
Green Hose
OFF
OFF
OFF
TES
T
SYS
TEM
VA
CUU
M
SYS
TEM
PR
ESS
URE
FILL
RA
DIAT
OR
& O
VER
FLO
W
EXC
HAN
GE C
OOL
ANT
EMP
TY W
AST
E TA
NK
LO
WER
RA
DIAT
OR
& O
VER
FLO
W
& O
VER
FLO
W
LOW
ER R
ADIA
TOR
EXC
HAN
GE C
OO
LAN
T O
R
FILL
RAD
IATO
R & O
VER
FLO
W
EM
PTY
WA
STE
TA
NK
Black Hose
Green Hose
Tank Cap & Plug
(Small)
New Coolant
SET UP
The MCX-2F has two tanks (plus an extra New Coolant Tank) which are installed and
connected from the rear. Quick connect couplers are mounted on the hoses which
connect these tanks to the MCX-2F. A green hose connects to the New Coolant Tank
(right side) and a black hose connects to the Waste Tank (left side). The small
diameter black drain hose must be inserted into the hole in the cap of the Waste Tank.
1. Slide the New Coolant Tank to the rear and sit it on the floor.
2. Remove the tank cap and fill the tank with new coolant and water in the
proportions specified by the coolant supplier. The tank can be disconnected
and moved to a bulk coolant storage area for filling if desired. A plug is provided
on the cap to prevent spillage during transport.
3. Replace the tank cap and position the tank in the MCX-2F. Make sure the
green hose is securely connected. Slide the tank to the front so the liquid level
can be seen through the front panel slot.
4. Make sure the plugs are removed from the caps on the Waste Tank and
the New Coolant Tank. This is required for venting the tanks during
operation. The small diameter black drain hose must be inserted into the
hole in the cap of the Waste Tank.
5. Fasten the clips on the tank strap to secure the tanks in the MCX-2F.