2 demand period, Demand period -11 – Yokogawa PR300 Power and Energy Meter User Manual
Page 34

<3. Procedures for Setting PR300 Functions>
3-11
IM 77C01E01-10E
3.4.2
Demand Period
[Procedure]
(1)
Write a demand period value to the D register in the table below. The data type is
integer.
(2)
After writing that value, write 1 to the demand measurement writing status register,
D0226.
D Register
D0219
D0226
Reference No.
40219
40226
H No.
00DA
00E1
Description
Demand period
Demand measurement writing
status (D0218 to D0225 are
validated)
Effective Range
1 to 60
(Demand alarm mask time to 60)
Unit: minute
If other than 1: Invalid
If 1: Writing is executed
Initial value of demand period: 30 minutes
[Example]
To set the demand period to 20 minutes:
For station number 01, use PC link communication (without checksum) and the random
write command as shown below:
[Command]
[STX] 01010WRW02D0219, 0014, D0226, 0001 [ETX] [CR]
[Response]
[STX] 0101OK [ETX] [CR]
NOTE
A demand period value can be set for the PR300 with demand measuring function.
- EJA130A (4 pages)
- EJA120A (31 pages)
- EJA130A (47 pages)
- EJA120A (40 pages)
- EJA438 (5 pages)
- EJA120A (6 pages)
- EJA115 (85 pages)
- EJA120A (47 pages)
- EJA120A (79 pages)
- EJA130A (2 pages)
- EJA210A (70 pages)
- EJA130A (4 pages)
- EJA430A (78 pages)
- EJX120A (4 pages)
- EJA210E (9 pages)
- EJX115A (55 pages)
- EJA210E (41 pages)
- EJA210E (96 pages)
- EJA210E (52 pages)
- EJA210E (89 pages)
- EJA210E (170 pages)
- EJX910A (55 pages)
- EJX910A (175 pages)
- EJX910A (83 pages)
- EJX910A (9 pages)
- EJX910A (103 pages)
- FlowNavigator Software (163 pages)
- EJA530A (67 pages)
- EJA120A (83 pages)
- EJX530A (52 pages)
- EJA110E (4 pages)
- EJA110E (85 pages)
- EJX120A (85 pages)
- EJA118 (76 pages)
- EJX118A (64 pages)
- EJA438 (72 pages)
- EJA430E (85 pages)
- EJA430E (7 pages)
- EJX430A (6 pages)
- EJX430A (40 pages)
- EJX430A (76 pages)
- EJA430E (41 pages)
- EJA430E (96 pages)
- EJX438A (10 pages)
- ADMAG AXR (194 pages)