Instructions for overhaul dis-assembly – Ramsey Winch RPH 45000 OVERWOUND W/ AIR TENSIONER & 2 SPEED MOTOR User Manual
Page 7
5
32
17
16
48
33
49
41
35
35a
INSTRUCTIONS FOR OVERHAUL
DIS-ASSEMBLY
1. Drain oil from gear housing #10 by removing pipe cap #44 from pipe nipple in end bearing.
Remove reducer #43 and relief fitting #39. If new air cylinder is required, remove air cylinder #34
from cover by removing (4) capscrews #23.
Remove washer #25, nut #26, setscrew #21, and insert #31 from end of air cylinder rod. Apply
Loctite to threads of nut #26 and thread onto setscrew #21 to 3/8” from drive end, as shown
below. Apply Loctite to threads of setscrew and thread insert #31 over end of setscrew and
against nut. Use setscrew and nut to thread insert #31 into end of air cylinder rod. Tighten nut
against cylinder rod, keeping 3/8” distance from drive end of setscrew to nut. If breather vent
#39 is damaged, remove and replace.
2. Disconnect tube #48 from elbow #32 on valve #49 and fitting
#33 on bottom of brake #35. Remove motor #41 and gasket
#35a by removing (2) capscrews #17. Remove valve #49, if
needed, from motor by loosening (4) capscrews #16.
31
26
34
39
31
AIR CYLINDER
ROD
APPLY LOC-TITE TO SETSCREW
44
10
43
40
25
21
38
25
23
21
26
3/8