Vestil STOR-96 & 912 User Manual
Page 12
STOR-96 and 912-G-W-1RH 0311
Copyright 2011 Vestil Mfg. Co.
Page 12 of 20
Insert fill Side Fill Panel into lockstrip and add lockstrip to other Side Fill Panel. Repeat this step for other side
of storage unit.
Install next side wall panel. Repeat on other side wall. Then install 10pc ¼”X2” lag bolts to secure walls to
wooden floor. 5 predrilled holes at the bottom of each wall.
Install lockstrips (2) on each side wall, then insert front wall into lockstrips. Install 5pc of ¼”X2”lag bolts into
predrilled holes to secure front wall to the wooden floor.
See also other documents in the category Vestil Equipment:
- ABLT-H (7 pages)
- ABLT-H-LP (5 pages)
- ACH-60 (20 pages)
- ALL-T-2-GPT (10 pages)
- ALL-T-2 (9 pages)
- A-LIFT (12 pages)
- AIR-2000 (12 pages)
- AHLT (12 pages)
- AHA-KIT Come-Along kit (5 pages)
- AHA (25 pages)
- AF-xxxx (4 pages)
- APPL-1200-xx (1 page)
- ASP Series (5 pages)
- ATD (6 pages)
- ATP (9 pages)
- ATS (9 pages)
- BC series (12 pages)
- BOL-OR-40-BK (3 pages)
- BOL-SS-42-5.5 (5 pages)
- BOL-SSTOR-42-4.5 (5 pages)
- BT (20, 40, & 60) (12 pages)
- SELF SUPPORTING BRIDGE CRANE (9 pages)
- CART-DS-1000 (15 pages)
- CAN-A (1 page)
- CART-23 & -24, ALL MODELS (12 pages)
- CART-500-SCL (1 page)
- CART-550-SS (15 pages)
- CART-D-FR (18 pages)
- CART-S-FR (18 pages)
- CB-PMPS (13 pages)
- CBS Series (13 pages)
- CB-W-P (1 page)
- CB-W-S (1 page)
- CC-30-MC (59 pages)
- CH series (12 pages)
- COL-3-26-14 (5 pages)
- CYL-CK (1 page)
- CUP-3131 (4 pages)
- CPC (10 pages)
- CP Series (8 pages)
- COL-4-36-23 (5 pages)
- COL-3-26-44 (5 pages)
- COL-3-26-23 (5 pages)
- H series hoppers (13 pages)
- D-150 Dock Seals & Shelter Survey Sheet (1 page)