Vestil BOLPP User Manual
Page 5
Step 2 Attach a short drain pipe to the end of the sleeve: Use a 10–12in. (25-30cm) piece of PVC tube to function
as a drain pipe to allow moisture to flow out of the sleeve. Center the PVC pipe on the hole in the bottom of the
sleeve and affix it to the sleeve, for instance with silicone adhesive. Allow the adhesive to dry before proceeding
to step 3.
Step 3: Fill the bottom of the hole with 16-20 inches of gravel, and then set the sleeve in the hole. Press the PVC
drain into the gravel until the top of the sleeve is flush with the ground, as shown in FIG. 4.
Step 4 Slowly fill the hole with concrete: Use 3,000psi compression rated concrete to fill the space around the
sleeve. Steadily fill the hole with concrete, and check the orientation of the sleeve as the hole fills. Adjust the
position of the sleeve as necessary. Do not completely fill the hole. Instead, stop pouring/adding concrete when
the level is 4-6inches below ground level.
Step 5 Set the bollard into position and check vertical levelness: Set the bollard on the support ledge of the sleeve
box, and rotate the bollard until the lock tab contacts the lock plate as shown in FIG. 5. Check the vertical
levelness of the bollard. Adjust the position of the bollard sleeve as needed to level the bollard. Fill the remainder
of the hole with concrete. Check the levelness of the bollard and adjust the position of the sleeve if necessary.
S
UPPORT
LEDGE
FIG.
5:
L
OCK
T
AB IN
CONTACT WITH
L
OCK
P
LATE
FIG. 6
Step 6: Allow the concrete to cure according to the instructions that accompany the concrete mixture used.
Step 7 Install the cover plates: Slide the cover plates into the slots on each side of the sleeve box (see FIG. 6).
Insert the plates into the slots, welded sides facing each other so that they will lay flat across the opening of the
sleeve box.
FIG. 7
U
SE
I
NSTRUCTIONS
To deploy the bollard:
1. Raise the bollard out of the sleeve by grasping and pulling
upwards on the retractable handle.
2. Rotate the bollard to place the lock tab and lock plate in contact.
See FIG. 7.
P
ADLOCK
TOGETHER
3. Lock the bollard in the raised position if desired, by inserting the
shackle of a padlock through the holes in the lock tab and the
lock plate. See FIG. 7.
FIG.
9
FIG. 8
To store the bollard:
1. Rotate the bollard until the lock tab
aligns with the slot in the sleeve.
2. Lower the bollard into the storage
compartment.
3. Raise the cover plates and lay them
across the opening. See FIG. 9.
- 5 -