Thank you for purchasing a fixed position bollard made by Vestil Manufacturing
Corporation (“Vestil”). Our bollards are durable, high-quality products designed for low-
speed traffic control. Despite the product’s relatively simple mechanics, all personnel must
familiarize themselves with the instructions provided in this manual.
Specifications for both bollard models appear in the table below:
Model
Maximum Above Ground
Height (after Installation)
Overall Length
Outer Diameter
Net Weight
(pounds)
BOLPP-24-5.5
24in. (~61cm)
34in. (~86cm)
5.5in. (~14cm)
44 (~20kg)
BOLPP-36-5.5
36in. (~91cm)
46in. (~117cm)
5.5in. (~14cm)
59 (~27kg)
BOLPP-42-5.5
42in. (~107cm)
52in. (~132cm)
5.5in. (~14cm)
73 (~33kg)
BOLPP-48-5.5
48in. (~122cm)
58in. (~147cm)
5.5in. (~14cm)
88 (40kg)
BOL-SS-42-5.5
42in. (~107cm)
100.75in. (~256cm)
4.5in. (~11cm)
163 (~74kg)
Vestil Manufacturing Corp. created this manual to acquaint owners and users of our bollards with safe use and
maintenance procedures. Employers are responsible for instructing employees to use the product properly.
Employees and any other persons, who might foreseeably install, use, repair, or perform maintenance on the
device must read and understand every instruction beforehand. All persons designated to install, use, repair
or maintain the bollard should have access to the manual at all times and should review the directions before
each use. Contact Vestil for answers to any question you have after reading the entire manual.
Mark
Ground
level on
bollard
I
NSTALLATION
I
NSTRUCTIONS
:
BOLPP
S
TEP
1
Determine ground level:
Measure the bollard from
the top to determine the ground level. Mark the bollard
at the point that corresponds to the above ground height
of your model. For example, if you ordered a BOLPP-
24-5.5, measure 24 inches from the top. Measure the
below ground portion (~10in.) as well. Described
measurements are depicted in FIG. 1 at right.
20
IN
(~51
CM
)
20
IN
(~51
CM
)
20
IN
(~51
CM
)
Step 2 Dig a hole for the below ground portion:
Remove a 20inx20inx20in cube (~51cm x 51cm x
51cm) of dirt to contain the concrete that will fix
the bollard in position. [Cube shown in FIG. 2].
Step 3 Partially fill hole and set bollard: Pour 3,000psi
compression rated concrete into the hole, until the top of
the concrete is a few inches from the top of the hole.
Press the bollard into the concrete. Make sure that the
mark you made on the bollard to indicate ground level
aligns with the top of the hole. Fill the hole the rest of
the way, so that the top of the concrete matches the
ground level mark on the bollard.
FIG. 3: Setting bollard in concrete
Ground level
mark
Ground
Concrete
Step 4 Cap the Bollard: Press the rubber cap into the
opening at the top of the bollard.