Installation, Installing the cb-mvpwds rough-in box – AMX Wall Docking Station MVP-WDS User Manual
Page 10
MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box
4
MVP-WDS Wall Docking Station for MVP Panels
Installation
MVP-WDS wall-docking stations can be installed either the CB-MVPWDS or other solid surface
environment using one of the two mounting options: drywall clips or solid surface screws, as described
in the following sub-sections.
Installing the CB-MVPWDS Rough-In Box
The CB-MVPWDS (FG037-10) is a metallic rough-in box that can be secured to a stud in a pre-wall
setting. The MVP-WDS can then installed into the rough-in box.
When mounting the rough-in box, the MVP-WDS Mounting Tabs must lie flush against the outside of
the sheetrock (FIG. 3).
Refer to installation diagram SP-5965-02 for detailed installation dimensions.
It is recommended that you cut out the surface slightly smaller than what is outlined in the
installation drawings so that you can make any necessary cutout adjustments.
The CB-MVPWDS can be installed with the removable access panel positioned either on top
or bottom. The access panel provides convenient access to in-wall wiring and must be re-
installed prior to mounting the MVP-WDS.
1.
Place the left side of the rough-in box on a stud, making sure that five Stud Fastening Holes and
removable Access Panel are oriented correctly (installation dependent). Be sure to leave enough of a
gap between the stud and Mounting Tabs to accommodate the installation of the drywall or
sheetrock after the rough-in box has been mounted. Ultimately, the Mounting Tabs should lie flush
against the outside of the sheetrock (FIG. 3).
Installation procedures and configurations vary depending on the installation
environment.
FIG. 3
CB-MVPWDS rough-in box components
Stud
Drywall or sheetrock
MVP-WDS mounting tabs
Wiring knockouts
Stud Fastening Holes
(5 located on left panel)
(right side of rough-in box)
(should lie flush against the
outside of the wall)
Removable Access Panel