beautypg.com

Lk series – General Pump LK Repair Manual User Manual

Page 17

background image

GENERAL PUMP

A member of the Interpump Group

LK SERIES

Page 17

Pre-assemble the PTO shaft:

Onto the PTO shaft, slip on the 2 internal rings of the bearings (one per side) (pos. 1, fig. 52).

The internal and external bearing rings must be reassembled in exactly the same

order and pairings in which they were dismantled.

From one side of the casing, insert the bearing lubrication bushing (pos. 1, fig. 53) and an external bearing

ring (pos. 1, fig. 54) using a pad and a mallet or striking hammer.

The crankcase must be inserted into the casing so that the teeth on the ring bevel gears are oriented

as shown in fig. 51.