beautypg.com

He series, General pump – General Pump HE User Manual

Page 13

background image

GENERAL PUMP

A member of the Interpump Group

HE SERIES

Page 13

Set up the complete package without tightening the

packing support (1, Fig. 20) but making sure that the

pressure packings snap into place.

For the correct load of the pressure packings proceed as

follows:

- Fit the plunger in the pumping unit (1, Fig. 21).

- Mark the position of any one of the 8 holes of the

packing support referencing at the cylinder (see

arrows Fig. 21).

- Tighten the packing support 1/8 turn

Fit the pumping units (1, Fig. 23) back in the pump after

replacing all relevant o-rings.

Fit the plunger back in place and tighten the plunger

screw (1, Fig 24) with a torque wrench set for 18 ft. lbs.

Grease the pressure packings through the greasers

(2, Fig. 24) by means of a hand pump. Stop greasing

when the pump trigger becomes hard to operate; that

means the grease chamber is full.

Mount the head/collector back in place and

tighten the eight head bolts with a torque

wrench set for 144 ft. lbs.