Section 3: Pre-Installation
12/12
16
51193 Revision 5
3.3. UNPACKING
Follow these guidelines when unpacking all equipment.
Check in all components and accessories according to the customer's order.
Remove all components from their packing material, checking against the invoice
that they are accounted for and not damaged.
▪ Advise the shipper immediately, if damage has occurred.
▪ Keep the shipping container and packing material for future use.
▪ Order any parts necessary to replace those which have been damaged.
▪ Check the packing list.
The
CUSTOMER
is the
receiving party
if the equipment was
shipped to
the Customer’s address.
FAIRBANKS
is the
receiving party
if the equipment was
shipped to the
Fairbanks Service Center.
Collect all necessary installation manuals for the equipment and accessories.
Open the equipment and perform an inspection, making certain that all hardware,
electrical connections and printed circuit assemblies are secure.
Do not reinstall the cover if the final installation is to be performed after the pre-
installation checkout.
Do not load the platform if there is any evidence of damage to the platform or
supporting structure.
All beams and channels come in banded bundles.