7. Who is providing assistance to lift and fasten the Unirail onto the rail

hangers? Will they be there?

8. Has the service technician reviewed the recommended set-up with

the Area Sales Manager or Area Service Manager, and identified all

necessary variations to satisfy the customer's particular

Application?

9. Will the equipment operator(s) be available for training?

1. Check that all components are on hand, and agree with the

customer's order.

2. Remove the Unirail from its packing material, checking to make

certain that all parts are accounted for and no parts are damaged.

Advise the shipper immediately if damage has occurred. Order any

parts necessary to replace those which have been damaged. Keep the

shipping container and packing material for future use. Check the

packing list.

3. Collect all necessary installation manuals for the instrument and

accessories.

4. Perform an inspection, making certain that all hardware and electrical

connections are secure.

As is the case with any material handling equipment, certain safety

precautions should be observed during operation:

1. Never load the Unirail beyond its rated capacity. Refer to the rating on

the serial number plate if in doubt.

2. Ensure that the structure which supports the Unirail is capable of

withstanding the weight of the Unirail plus its rated capacity load.

3. Do not load the Unirail if there is any evidence of damage to it or its

supporting structure.