Fairbanks 5260 Series Unirail User Manual
Page 8
4. Customer and site readiness:
a. Is the Location ready?
b. Is the customer aware there will be work disruptions?
c. Are the operators available for training?
5. Installation of the Unirail (See Note).
6. Installation of the digital weight indicator.
7. Calibration and Adjustments
8. Customer training
Note:
Rail hangers, mounting hardware, and any further supports are not
provided. The weight of the Unirail varies from 95 lbs to 150 lbs.
The following points should be checked and discussed with the Area
Sales Manager, Area Service Manager, and/or customer, if necessary,
before the technician goes to the site to install the equipment.
1. Has the customer's application been checked to make certain that it is
within the capabilities and design parameters of the equipment?
2. If the installation will disrupt the customer's normal operations, is he
aware and has he made arrangements?
3. Is properly-grounded AC power available at the installation location?
4. Has the service technician thoroughly reviewed the installation
procedures?
5. Who is providing the exact location and opening in the overhead
monorail? Will they be there?
6. Who is providing the rail hangers, mounting hardware, and any other
supports? Will they be there?
50019
8
03/12 - Rev. 8
C.
Pre-Installation
Checklist