Load cell replacement steps – Fairbanks Aegis Industrial Mild Steel User Manual
Page 20
![background image](/manuals/347074/20/background.png)
08/12
20
51102 Rev. 7
Section 5: Parts Replacement
Load Cell Replacement Steps
1. Cycle-down the power to the indicator, then unplug the unit.
2. Remove the platform and junction box access covers.
3. Disconnect the failed load cell cable(s) at the junction box.
4. Loosen the gland bushing, and tie a string or wire to the end of the cable to act as
a pull wire.
5. Place wire markers on the cable ends.
─
Masking tape is an effective alternative
6. Disconnect the faulty load cells wires from the terminal block.
7. Lift the platform end with a forklift or heavy pry bar, using wood blocks for safety.
8. Remove the load cell mounting bolts with a
3/4" socket
.
9. Remove the load cell, pulling the cable through the scale while leaving the pull
string/wire in the scale.
10. Remove the foot assembly from the old cell, then install it onto the new load cell.
─
Use anti-seize on the threads.
11. Disconnect the pull string/wire from the old cell's cable, then attach to the new
cell's cable end.
12. Pull the cable from the new cell through to the junction box.
13. Mount the cell to the scale platform.
─
Torque it to
90 ft/lbs
, using anti-seize on the mounting bolts.
14. Lower the scale to the surface removing the safety blocks.
15. Distribute the scale’s weight evenly by all four (4) feet.
16. Connect the load cell wires into the junction box, then tighten the box gland
bushing(s).
17. Replace the platform access cover.