Operation – Fulton Reliance (RLN) High Efficiency Cooper Fin Boiler User Manual
Page 38

© The Fulton Companies 2012
OPERATION
RLN-IOM-2012-1205
SECTION 3
3-8
!
WARNING
Non-Fulton product information is for
reference purposes only. No Fulton
document should substitute for full
review of documentation available
from the component manufacturer.
4
CAUTION
Only factory-trained personnel should
attempt to alter password protected
Control preset values.
Cycle and Run Hours Monitoring
Burner cycles, burner run time, and pump cycles can be viewed from the
Statistics Confi guration screen on the Control. See Figure 14.
FIGURE 13 - MAIN/HOME SCREEN
FIGURE 14 - CYCLE AND RUN HOURS MONITORING
Setpoint Confi guration
Refer to Figure 15 for Setpoint Confi guration data.
Setting the Central Heat Setpoint
Refer to Figures 15 -17 for CH Confi guration and Operation details.
Reviewing Status Detail
Refer to Figure 18 for fl ame signal status detail.