Dixon Valve 25 TON RAM SEC05 Converting User Manual
Page 4
25 Ton Ram Instruction Manual
Converting from Swaging to Expansion
customer service
800
•
355
•
1991
3
Section 5
There are two options for positioning the ram for
internal expansion:
Install the 45° angle bracket.
Remove the safety bolts behind the 1” nuts. Loosen
the left 1” nut (when facing ram), then the right 1”
nut (when facing ram). If this sequence is reversed
(right, then left) the cylinder will rotate backwards
on its own.
Lower the Ram carefully until it rests on the
bracket. You are now ready to internally expand.
CAUTION! The ram is extremely heavy. It may
be necessary to have 2 people (1 on each side) to
lower the ram.
Option #2 - Do not install the 45° bracket.
Lower the Ram completely until it rests on the
safety bumper. You are now ready to internally
expand.
CAUTION! The ram is extremely heavy. It may be
necessary to have 2 people (1 on each side) to lower
the ram.
10b
10a
11
9
- Safety Opening Minds (2 pages)
- SOS van (2 pages)
- Railcar Unloading assemblies (1 page)
- One Piece 8 Frac Fitting" (2 pages)
- Newsletter:February:Search:Safety (2 pages)
- Literature Order Form (1 page)
- KC CW 2014 (1 page)
- Flotech FT470 (1 page)
- F40 tool (2 pages)
- F38 tool (2 pages)
- F175 tool (2 pages)
- F100 tool (2 pages)
- F1 Tool (2 pages)
- CW CH Reg April 2014 (1 page)
- C2 tool (2 pages)
- 51960 tool (2 pages)
- Coupling Inserter CI96 (2 pages)
- CI9 Large Diameter Coupling Inserter (2 pages)
- Manual crimper for Brass ferrules: 860 and 855 (2 pages)
- CM400 crimper (2 pages)
- 5111A Brass Ferrule Crimper (4 pages)
- 1765A Brass Ferrule Crimper (5 pages)
- HB Coupling Expander (6 pages)
- 15 TON RAM Internal Expanded Holedall Petroleum (5 pages)
- 15 TON RAM Internal Expanded Carbon And Stainless Couplings (4 pages)
- 15 TON RAM - Parts List (4 pages)
- 25 TON RAM SEC10 Parts and Attachments (12 pages)
- 50 TON RAM SEC09 Internal Expanded Holedall Petroleum (3 pages)
- 25 TON RAM SEC08 Product Updates (4 pages)
- 25 TON RAM SEC07 Holedall Petroleum IX (4 pages)
- 25 TON RAM SEC06 Internal Expanded Carbon Stainless Couplings (5 pages)
- 25 TON RAM SEC04 External Swaged Cam and Groove (8 pages)
- 25 TON RAM SEC03 External Swaged RST and GAS (5 pages)
- 25 TON RAM SEC02 External Swaged Holedall (6 pages)
- 25 TON RAM SEC01 Holedall Fittings (35 pages)
- 25 TON RAM Complete Manual (89 pages)
- 50 TON RAM SEC10 Parts And Attachments (5 pages)
- 50 TON RAM SEC08 Internal Expanded Carbon And Stainless Couplings (5 pages)
- 50 TON RAM SEC07 Converting (3 pages)
- 50 TON RAM SEC06 External Swaged Ground Joint (7 pages)
- 50 TON RAM SEC05 External Swaged Cam And Groove (12 pages)
- 50 TON RAM SEC04 External Swaged RST and GAS (6 pages)
- 50 TON RAM SEC03 External Swage Holedall with Jackscrews (8 pages)
- 50 TON RAM SEC02 External Swaged Holedall (6 pages)