Dixon Valve 25 TON RAM SEC05 Converting User Manual
Page 2
25 Ton Ram Instruction Manual
Converting from Swaging to Expansion
customer service
800
•
355
•
1991
1
Section 5
Loosen the keeper plate bolts, and remove all die
holders.
Install the retaining bolt with washer into hole of
the main Ram pusher plate (25T5).
Before you begin make sure the Ram is fully
retracted. Remove the 25PUSH400
(also referred to as the pusher hat) from the main
pusher plate, if installed on the Ram.
Laying the 25IXATTACH on it’s side, move the
guide plate to the center. Slide the retaining collar
up until it contacts the guide plate. Tighten the set
screw in the retaining collar.
Stand the 25IXATTACH up so that the end with the
slot is on top.
3
2
4
1
See also other documents in the category Dixon Valve Tools:
- Safety Opening Minds (2 pages)
- SOS van (2 pages)
- Railcar Unloading assemblies (1 page)
- One Piece 8 Frac Fitting" (2 pages)
- Newsletter:February:Search:Safety (2 pages)
- Literature Order Form (1 page)
- KC CW 2014 (1 page)
- Flotech FT470 (1 page)
- F40 tool (2 pages)
- F38 tool (2 pages)
- F175 tool (2 pages)
- F100 tool (2 pages)
- F1 Tool (2 pages)
- CW CH Reg April 2014 (1 page)
- C2 tool (2 pages)
- 51960 tool (2 pages)
- Coupling Inserter CI96 (2 pages)
- CI9 Large Diameter Coupling Inserter (2 pages)
- Manual crimper for Brass ferrules: 860 and 855 (2 pages)
- CM400 crimper (2 pages)
- 5111A Brass Ferrule Crimper (4 pages)
- 1765A Brass Ferrule Crimper (5 pages)
- HB Coupling Expander (6 pages)
- 15 TON RAM Internal Expanded Holedall Petroleum (5 pages)
- 15 TON RAM Internal Expanded Carbon And Stainless Couplings (4 pages)
- 15 TON RAM - Parts List (4 pages)
- 25 TON RAM SEC10 Parts and Attachments (12 pages)
- 50 TON RAM SEC09 Internal Expanded Holedall Petroleum (3 pages)
- 25 TON RAM SEC08 Product Updates (4 pages)
- 25 TON RAM SEC07 Holedall Petroleum IX (4 pages)
- 25 TON RAM SEC06 Internal Expanded Carbon Stainless Couplings (5 pages)
- 25 TON RAM SEC04 External Swaged Cam and Groove (8 pages)
- 25 TON RAM SEC03 External Swaged RST and GAS (5 pages)
- 25 TON RAM SEC02 External Swaged Holedall (6 pages)
- 25 TON RAM SEC01 Holedall Fittings (35 pages)
- 25 TON RAM Complete Manual (89 pages)
- 50 TON RAM SEC10 Parts And Attachments (5 pages)
- 50 TON RAM SEC08 Internal Expanded Carbon And Stainless Couplings (5 pages)
- 50 TON RAM SEC07 Converting (3 pages)
- 50 TON RAM SEC06 External Swaged Ground Joint (7 pages)
- 50 TON RAM SEC05 External Swaged Cam And Groove (12 pages)
- 50 TON RAM SEC04 External Swaged RST and GAS (6 pages)
- 50 TON RAM SEC03 External Swage Holedall with Jackscrews (8 pages)
- 50 TON RAM SEC02 External Swaged Holedall (6 pages)