beautypg.com

Warning – Detroit Radiant Products Company LS3 Series User Manual

Page 48

background image

48

LS3

Series

Sequence of Operation

Standby: The ignition module (circuit board)continually checks for internal faults, circuit integrity and relay

contact positioning.

Starting Circuit: Upon a call for heat, the control verifies that the burner and exhaust pressure switches

are in their proper positions. The control energizes the fan. Once operational static pressure is
achieved, the burner pressure switch will close initiating the ignition sequence. The hot surface
igniter is powered and the gas valve opens after 45 seconds. If the flame is not sensed, the heater
will attempt to re-ignite for a total of 3 trials for ignition before proceeding to soft lockout.

Running Circuit: After ignition, the flame rod monitors burner flame. If sense of flame is lost, the control

closes the gas valve within one second and a new trial sequence (identical to the starting sequence)
is initiated. If flame sense is not established within 8.5 seconds, the heater will attempt two additional
ignition sequences before proceeding to soft lockout. The control can be reset by briefly interrupting
the power source.

Shut Down: When the thermostat is satisfied, the fan will enter a two (2) minute post-purge cycle.

Diagnostics

Lockout:
The controls will automatically lockout the heater system when an external or system fault occurs. There
are two types of lockout:

Soft Lockout: The heater will attempt to light three times. In the event of a failed attempt to light, (gas

pressure, valve, no flame sense etc.), the heater will enter a soft lockout period for 30
minutes and then attempt to light three more times before entering hard lockout mode.

Hard Lockout: If proof of flame is not established, a component failure occurs or blockages are evident,

the heater will enter a hard lockout. If lockout occurs, the control can be reset by briefly
interrupting the power source. Refer to Charts 4.1 & 4.2 for a description of LED codes.

Externally located operational indicator lights are provided to assist in troubleshooting of the heater. Refer
to pages 50-53 for additional troubleshooting.

WARNING

!

This heater must be installed and serviced by trained gas installation and service
personnel only.

Do not bypass any safety features or the heater’s built in safety mechanisms will
be compromised.

4.0

Operation

Sequence of Operation