beautypg.com

Final check list – Detroit Radiant Products Company QTD Series User Manual

Page 17

background image

QTD

Series

17

3.0

Installation

Hanging Pre-Assembled Unit

Final Check List

Final Check List

1

Check the unit for level across the length (Figure 3.7).

2

Check the unit for level across the width (Figure 3.8).

Figure 3.7

Hanging the Heater (Side View)

Figure 3.8

Hanging the Heater

(Burner Box Back View)

Figure 3.9

Hanging the Heater

(Exhaust End View)

12.25”

12.75”

11.5”

7”

7”

12.75”

2”

83”

13.5”

4.5”

Mount Heater Level

- Front to Back -

Mount Heater Level

- Front to Back -