beautypg.com

Installing the reflector assembly – Detroit Radiant Products Company QTD Series User Manual

Page 14

background image

NOTE: Prior to installing the reflector, relocate the saw horses to support the burner control box and the
tubes beneath the u-end reflector.

1

Align the reflector end cap holes (2) with the corresponding burner control box studs (see Detail

‘C’-Step 1).

NOTE: Do not remove the existing nuts on studs.

2

. Lower the U-end reflector end cap (TP-6084A) down over the tubes while shifting the reflector

assembly towards the burner control box. (see Detail ‘C’-Step 2).

3

Secure burner reflector end cap (TP-6085A) with (2) 5/16”-18 keps nuts (see Detail ‘D’). Note: The

burner reflector end cap does not have a tab with slots.

4

Secure the U-end reflector end cap using the red shoulder screws (TP-6086A) provided (see Detail ‘E’).

5

Repeat process with remaining reflector assembly.

Venting Installation

1

Insert vent adapter (TP-6080) into vent pipe (TP-6075) and secure with (3) self-drilling screws (TP-13).

2

Install venting assembly and secure to vent outlet with (3) self-drilling screws (TP-13) (See Detail

‘C’-Step 3). See page 18 for additional venting requirements.

Installing the Reflector Assembly

DETAIL ‘D’

Secure burner reflector end cap
(TP-6085A) with (2) 5/16”-18 keps
nuts per assembly.

DETAIL ‘E’

Secure the U-end reflector end cap
using the #8 x 1/2” red shoulder screws
(TP-6086A). Two per assembly.

Step 2

Step 1

Step 3

DETAIL ‘C’

Vent Outlet

Figure 3.4

Final Heater Assembly

QTD

Series

14

3.0

Installation

Heater Assembly

Installing Angle Limitation Brackets