Weekly maintenance checklist, Monthly maintenance checklist – Magnum Venus Plastech Pro Series 11:1 PRO PUMP VPRO-45110 User Manual
Page 10

10
WEEKLY MAINTENANCE CHECKLIST
PART
PROCEDURE
Ai
r Filter (“Water Trap”)
Drain
Hoses
Check for kinks or leaks.
Gauges and Regulators
Check for damage and proper operation.
Accumulator
Remove and clean inside. Danger: Never attempt to
remove an accumulator until you have relieved
pressure. See Chapter 5: Accumulator & Filter.
Filter
Clean and inspect filter screen for plugging. Note:
Clean the screen weekly and when changing from
one material to another. Use proper screen mesh
size according to the material being used.
Pro Pump
Check the oil reservoir and add oil if needed. If
necessary, clean and dry the silencers.
Pro Pump Lower Assembly
Check the pickup hose and wand for leaks and
damage. Check for packing leaks.
Air Lines
Check for leaks, wear and kinks. Replace if necessary.
MONTHLY MAINTENANCE CHECKLIST
PART
PROCEDURE
Ai
r Filter (“Water Trap”)
Drain.
Hoses
Check for kinks or leaks.
Gauges and Regulators
Check for damage and proper operation.
Accumulator
Remove and clean inside. Danger: Never attempt to
remove an accumulator until you have relieved pressure.
See Chapter 5: Accumulator & Filter.
Filter
Clean and inspect filter screen for plugging. Note: Clean the
screen weekly and when changing from one material to
another. Use proper screen mesh size according to the
material being used.
Pro Pump
Check the oil reservoir and add oil if needed. If necessary,
clean and dry the silencers.
Pro Pump Lower Assembly
Check the pickup hose and wand for leaks and damage.
Check for packing leaks.
Catalyst Jug
Check and clean tubes and filter screens if necessary.
Danger: Fire and explosion hazard. Never allow solvent
or grease to contact any part of the catalyst system.
Air Lines
Check for leaks, wear and kinks. Replace if necessary.