beautypg.com

Weekly maintenance checklist, Monthly maintenance checklist – Magnum Venus Plastech Pro Series 11:1 PRO PUMP VPRO-45110 User Manual

Page 10

background image

10

WEEKLY MAINTENANCE CHECKLIST

PART

PROCEDURE

Ai

r Filter (“Water Trap”)

Drain

Hoses

Check for kinks or leaks.

Gauges and Regulators

Check for damage and proper operation.

Accumulator

Remove and clean inside. Danger: Never attempt to
remove an accumulator until you have relieved
pressure.
See Chapter 5: Accumulator & Filter.

Filter

Clean and inspect filter screen for plugging. Note:
Clean the screen weekly and when changing from
one material to another. Use proper screen mesh
size according to the material being used.

Pro Pump

Check the oil reservoir and add oil if needed. If
necessary, clean and dry the silencers.

Pro Pump Lower Assembly

Check the pickup hose and wand for leaks and
damage. Check for packing leaks.

Air Lines

Check for leaks, wear and kinks. Replace if necessary.

MONTHLY MAINTENANCE CHECKLIST

PART

PROCEDURE

Ai

r Filter (“Water Trap”)

Drain.

Hoses

Check for kinks or leaks.

Gauges and Regulators

Check for damage and proper operation.

Accumulator

Remove and clean inside. Danger: Never attempt to
remove an accumulator until you have relieved pressure.

See Chapter 5: Accumulator & Filter.

Filter

Clean and inspect filter screen for plugging. Note: Clean the
screen weekly and when changing from one material to
another. Use proper screen mesh size according to the
material being used.

Pro Pump

Check the oil reservoir and add oil if needed. If necessary,
clean and dry the silencers.

Pro Pump Lower Assembly

Check the pickup hose and wand for leaks and damage.
Check for packing leaks.

Catalyst Jug

Check and clean tubes and filter screens if necessary.
Danger: Fire and explosion hazard. Never allow solvent
or grease to contact any part of the catalyst system.

Air Lines

Check for leaks, wear and kinks. Replace if necessary.