Daily start-up & shut-down – Magnum Venus Plastech PATRIOT 1:1 ADHESIVE SYSTEM User Manual

Page 28

background image

Patriot 1:1 Adhesive System Operations Manual

Rev. 09/2012

Page | 28

Daily Start-up & Shut-Down:


DAILY STARTUP

1. Check and refill all components and materials.

2. Close the relief valve on the flush tank lid.

3. Open the main air supply lockout ball valve to pressure up the system. Bleed off any water,

check the system for leaks and damage, replace or repair items as needed.

4. Check that Air Lift pressure settings and pump pressure settings are set to the appropriate

settings. If needed press and hold the priming button and adjust the pump pressure.

5. Apply a small amount of red grease (7607-2-1) to the threads of the mix chamber.

6. Reassemble and attach mixer assembly.

7. Check flush system for proper operation.

The system is ready for use.


DAILY SHUT-DOWN

1. Drain water trap filter daily.

2. Thoroughly flush and clean the mixer and mix chamber.

3. Remove mixer from the mix chamber.

4. Close the main air lockout ball valve to relieve air pressure from the system.

5. Lift the relief valve on the flush tank lid to release flush tank pressure.