Gun connections, Pre startup instructions – Magnum Venus Plastech PATRIOT 1:1 ADHESIVE SYSTEM User Manual

Page 18

background image

Patriot 1:1 Adhesive System Operations Manual

Rev. 09/2012

Page | 18













Gun Connections:






















Pre Startup Instructions:


1.

Check all hoses for wear or damage from shipping, replace if necessary.

2.

Check to be sure you have appropriate quantities of both materials to complete the job.

3.

Check and repair or replace any damaged items before starting a job.

4.

Be sure all fluid connections are tight.

5.

Adjust the pump packing nut /solvent cup – the pump packing nuts should only be a little more
then hand tight (1/4 turn). If they are too tight it will cause the pump to bind and shutter (jerky
motion) at low pressures. Tighten as need when some material appears in the bottom of the
cup/nut.


Figure 4

Main Air Supply connection

Solvent from the flush tank

Air Purge air supply

Air supply to gun handle

Signal to activate the system

Adhesive and Activator supply

Flush/Air Purge Button

Air Purge / Solvent selector

Figure 5

Ram UP/DOWN Valve