beautypg.com

Controlled Products Systems Group 10441811 User Manual

Page 9

background image

6. Turn the rod one half revolution clockwise (Fig. 9, Ref. 2).
7. Assemble the front bracket as shown in Fig. 10.
8. Fix the operator to the rear bracket by means of the sup-

plied pins as shown in Fig. 11.

Attention: allow the bracket to cool before fastening the

operator to it.
9. Close the leaf and, while keeping the operator perfectly

horizontal, determine the fastening point of the front

bracket (Fig.12).

10. Temporarily fix the front bracket with two welding spots

(Fig.12).

Note: if the gate structure does not allow a fixed bracket

fastening it is necessary to create a sturdy supporting

base in the gate structure.
11. Release the operator (see Section 6) and manually check

that the gate moves regularly without friction or hin-

drances. Ensure that it opens completely and stops at the

mechanical travel stops.

12. Perform the necessary corrective measures and repeat

from Step 11.

13. Temporarily release the operator from the front bracket

and permenantly weld the bracket.

If the leaf structure prevents the bracket from being welded,

screw it to the leaf with adequate securing hardware.
Note: Grease all fastening pins of the fittings.

4.5. Wiring the Operator

IMPORTANT : Use the supplied cable or a similar UL ap-

proved cable for outdoor use.
A terminal block is available in the lower part of the operator

to connect the motor and the limit switches

Motor Wiring Instructions:

1. Open one of the pre-

drilled holes in the sup-

plied cover (Fig.13).

2. Fit the supplied cable

gland.

3. Connect the motor (refer

to Fig.14 and accompany-

ing table)

9

FAAC Model 415 L LS 24V Swing Gate Operator

Fig. 9

Fig. 11

Fig. 10

Fig. 12

Fig. 13