beautypg.com

Repairs, Manual operation, Maintenance – Controlled Products Systems Group 10441811 User Manual

Page 11

background image

5. Reposition the cap (Fig. 18 Ref. B) and tighten the

fastening screw (Fig. 18 Ref. A).

4.7. Start-up

ATTENTION: Cut power before performing any work on

the system or operator.
Carefully observe the GENERAL SAFETY RULES.
Following the indications in Fig. 3, lay the proper cable

conduits and make the electrical connections of the control

board and chosen accessories.
1. Power up the system and determine the status of

the LEDs (as shown in the table of the control board

instructions).

2. Program the control board according to your needs by

following the control board instructions.

3. Test the system, carefully checking the operating effi-

ciency of the motor and of all the accessories connect-

ed to it, paying special attention to the safety devices

If the gate system needs to be moved manually due to lack

of power or to an operator malfunction, proceed as follows:
1. Cut power by means of the safety circuit breaker (even

in the event of a power outage).

2. Slide the protective cap, Fig. 21, Ref. 1.
3. Insert the key and turn it 90°, Fig .21, Ref. 2.
4. To release the operator, turn the control lever 180°

in the direction indicated by the arrow on the release

system, Fig.21, Ref. 3.

5. Open and close the leaf manually.

7. REPAIRS

For any repairs, contact an authorized FAAC repair center.

Fig. 21 Ref. 2

Note: To keep the operator in manual operation, the control

lever should be left in its current position (turned 180˚) and

power should be cut to the system.

Restoring Normal Operation

To restore normal operating conditions, proceed as follows:
1. Turn the release system’s control lever 180° in the op-

posite direction of the arrow.

2. Turn the release key 90° and remove it.
3. Close the protection cover.
4. Power up the system and perform a complete cycle of

movement to check that the automated system is cor-

rectly restored.

Fig. 21 Ref. 3

5.

MANUAL OPERATION

To ensure safety and trouble-free operation, an overall

check of the system should be carried out every 6 months.

6. MAINTENANCE

11

FAAC Model 415 L LS 24V Swing Gate Operator

Fig. 20

Fig. 21 Ref. 1