5 installation, English, 2 tools and materials – CAME FrogJ-S Kit User Manual
Page 4: 1 preliminary checks

4
ENGLISH
T
h
e d
at
a a
n
d i
n
fo
rm
at
io
n s
h
ow
n i
n
t
h
is
d
ia
lo
g
u
e m
ay b
e c
h
an
g
ed by C
am
e C
an
ce
ll
i A
u
to
m
at
ic
i S
.p
.A
. a
t a
n
y t
im
e w
it
h
o
u
t p
ri
o
r w
ar
ning
.
Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and com-
pliance with the current standards and regulations. The following figure illustrates the minimum equipment needed by the
installer.
5.2 Tools and materials
5 Installation
Before installing, do the following:
• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off)
power supply.
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage.
• Fit tubing to drain away any water leaks which may cause oxidation.
• Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra
insulation as compared to the other conductive parts inside;
• Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving
parts.
• Make sure there is a mechanical stop for opening and closing.
Installation must be carried out by expert qualified personnel and in full compliance with current regulations.
5.1 Preliminary checks