beautypg.com

English, 5 installing the operator – CAME Amico-S230 Kit User Manual

Page 5

background image

5

T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n s

h

ow

n i

n

t

h

is

m

an

u

al

m

ay b

e c

h

an

g

ed by CAM

E

c

an

ce

ll

i a

u

to

m

at

ic

i s

.p

.a

. a

t a

n

y t

im

e w

it

h

o

u

t p

ri

o

r w

ar

n

ing

.

ENGLISH

Warning: after establishing the best point to which you will secure the gate bracket, secure the bracket to the pillar and make sure
the quotas shown in the table below are met.
Note: by increasing measure B, the opening angle and gate speed are reduced, while the gearmotor thrust is increased. By
increasing the measure A, the opening angle and gate speed are increases, while the gearmotor thrust is decreased.

Opening

A

(mm)

B

(mm)

C

(mm)

90°

130

130

60

120°

130

110

50

Ideal securing

point

Gate bracket

Pillar bracket

Lay the corrugated tubing needed for the connections deriving from the junction box.
N.B. the number of tubes depends on the type of system and accessories employed.

The following illustrations are only examples, given that the space available for anchoring the operator and accessories

may vary from gate to gate. It is up to the installer, thus, to choose the most suitable solution.

5.5 Installing the operator

Electric cable junction box

This manual is related to the following products: