Installation, Preliminary checks, Underground installations – CAME Myto ME User Manual
Page 7

640
150
420
90 °
20
75
400
110 °
375
70
0
125 °
Pa
g.
77
- M
an
u
al
c
od
e:
11
9
A
V
17
11
9
A
V
17
ve
r.
1
.0
1.
0
0
2
/2
0
10 © C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. - T
h
e d
ata a
n
d i
nf
or
m
ati
on r
ep
orte
d i
n th
is
in
sta
lla
tio
n m
an
u
al
a
re s
u
sc
ep
tib
le to
c
h
an
g
e at a
ny ti
m
e a
n
d w
ith
ou
t o
b
lig
ati
on
o
n C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. to n
otify u
se
rs.
ENGLISH
Installation
Preliminary checks
Before installing, do the following:
• Make sure you have a suitable omni-polar cut-off device with contacts more than 3 mm apart, and independent (sectioned off)
power supply.
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage.
• Fit tubing to drain away any water leaks which may cause oxidation.
• Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra insula-
tion as compared to the other conductive parts inside;
• Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving
parts.
• Make sure there is a mechanical stop for opening and closing.
Installation must be carried out by expert qualified personnel and in full compliance with current regulations.
Underground installations
Opening gate leaf at max 90°
Opening gate leaf at max 110°
Opening gate leaf at max 125°