beautypg.com

Installation, Preliminary checks, Underground installations – CAME Myto ME User Manual

Page 7

background image

640

150

420

90 °

20

75

400

110 °

375

70

0

125 °

Pa

g.

77

- M

an

u

al

c

od

e:

11

9

A

V

17

11

9

A

V

17

ve

r.

1

.0

1.

0

0

2

/2

0

10 © C

A

M

E c

an

ce

lli

auto

m

ati

ci

s.p.a. - T

h

e d

ata a

n

d i

nf

or

m

ati

on r

ep

orte

d i

n th

is

in

sta

lla

tio

n m

an

u

al

a

re s

u

sc

ep

tib

le to

c

h

an

g

e at a

ny ti

m

e a

n

d w

ith

ou

t o

b

lig

ati

on

o

n C

A

M

E c

an

ce

lli

auto

m

ati

ci

s.p.a. to n

otify u

se

rs.

ENGLISH

Installation

Preliminary checks

Before installing, do the following:

• Make sure you have a suitable omni-polar cut-off device with contacts more than 3 mm apart, and independent (sectioned off)
power supply.
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage.
• Fit tubing to drain away any water leaks which may cause oxidation.
• Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra insula-
tion as compared to the other conductive parts inside;
• Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving
parts.
• Make sure there is a mechanical stop for opening and closing.

Installation must be carried out by expert qualified personnel and in full compliance with current regulations.

Underground installations

Opening gate leaf at max 90°

Opening gate leaf at max 110°

Opening gate leaf at max 125°